Progetti

  • CLIENT

    SAFAB SPA on Behalf of ANAS S.p.A. (National Roads Agency)

  • LOCATION

    Salerno – Reggio Calabria Highway. Italy

As part of the rehabilitation and upgrading works along Salerno – Reggio Calabria Highway, Sering developed the Construction design of Brignano I and Brignano II viaducts.

The main characteristics of Brignano I viaduct are as follows:

  • Total length 310 m
  • Simple supported spans
  • Maximum height 20 m
  • Span length 17 m
  • Pier foundations consist of drilled and cast in place piles, diameter d = 1200 mm, length L = 25 m
  • Abutment foundations consist of shaft foundations 16 m deep

The main characteristics of Brignano II viaduct are as follows:

  • Total length 400 m
  • Simple supported spans
  • Maximum height 20 m
  • Span length 35 m+
  • Pier foundations consist of drilled and cast in place piles, diameter d = 1200 mm, length L = 25 m

Sering provided to develop several services including:

  • Carrying out site investigations;
  • The critical elaboration of the experimental data with on-site investigations and laboratory tests, to examine the physical-mechanical properties of foundation soils;
  • The geotechnical characterization of soils
  • Research, geotechnical and structural terms, the best solutions for the viaducts
  • Structural and geotechnical design of the viaducts
  • Technical assistance to the Contractor during construction