CLIENT
SAFAB SPA on Behalf of ANAS S.p.A. (National Roads Agency)
LOCATION
Salerno – Reggio Calabria Highway. Italy
As part of the rehabilitation and upgrading works along Salerno – Reggio Calabria Highway, Sering developed the Construction design of Brignano I and Brignano II viaducts.
The main characteristics of Brignano I viaduct are as follows:
- Total length 310 m
- Simple supported spans
- Maximum height 20 m
- Span length 17 m
- Pier foundations consist of drilled and cast in place piles, diameter d = 1200 mm, length L = 25 m
- Abutment foundations consist of shaft foundations 16 m deep
The main characteristics of Brignano II viaduct are as follows:
- Total length 400 m
- Simple supported spans
- Maximum height 20 m
- Span length 35 m+
- Pier foundations consist of drilled and cast in place piles, diameter d = 1200 mm, length L = 25 m
Sering provided to develop several services including:
- Carrying out site investigations;
- The critical elaboration of the experimental data with on-site investigations and laboratory tests, to examine the physical-mechanical properties of foundation soils;
- The geotechnical characterization of soils
- Research, geotechnical and structural terms, the best solutions for the viaducts
- Structural and geotechnical design of the viaducts
- Technical assistance to the Contractor during construction