Progetti

  • CLIENT

    BATCO on behalf of Ministry of Public Works, UAE

  • LOCATION

    Dibba – Khorfakkan – UAE

The project concerns a dual carriageway mountainous road with 2 tunnels each 0.5 km long (the first tunnels ever constructed in UAE) and the relevant mechanical and electrical equipment, two roundabouts and excavation of very steep rock slopes improved by means of bolt nets, and protection barriers.

Services provided by Sering

  • Critical elaboration of the experimental data with on-site investigations and laboratory tests, to examine the physical-mechanical properties of foundation soils and rocks;
  • Geotechnical characterization of soils and rocks
  • Research, geotechnical and structural terms, the best solutions for the tunnels
  • Detailed and construction design of the tunnels
  • Technical assistance to the Contractor during construction