CLIENT
Ministry of Environment and Water
LOCATION
Sevievlo (Bulgaria)
The aim of the Integrated water project for the town of Sevlievo, LOT 3, is to make a diagnostics and assessment of the condition of the infrastructure in the water sector, on the basis of which it shall be prepared a feasible investment programme to the Application Form of Integrated Water Project – Town of Sevlievo, for funding in accordance with operational programme “Environment 2007-2013”
The objectives of the investment measures in the water supply sector are:
- To provide the population with drinking water in adequate quantity and quality
- To limit water losses along the water supply network
- To increase the proportion of the population which is connected to the water supply network by rehabilitation and remediation of existing water supply facilities and construction of new water supply facilities
The objectives of the investment measures in the wastewater sector are:
- To decrease the direct discharge of untreated wastewater to surface water by construction of WWTP
- To optimize the work of WWTP’s by reduction of leakages in the sewer networks and other improvements
- To increase the population served by sewer networks;
- To increase the proportion of the population whose wastewater discharge receives full treatment
- Investigation, analysis and assessment of the hydraulic condition of the water supply network
Services provided by Sering
- Masterplan for the whole town of Montana
- Feasibility Studies
- Preliminary Design
- Detailed Design with Hydraulic Model of the water supply system