    Muscat Municipality

  • LOCATION

    Muscat Governorate – Sultanate of Oman

SERING International has carried out the Inventory and the Inspection of all Muscat Municipality bridges. The team has inspected  25 main Roads / Highways and  223 bridges

Services provided by Sering International

  • Inventory and codification of bridges
  • Data collection and selection of documents
  • Bibliography research and state of art
  • Visual inspection
  • Geometrical surveys of missing data bridges
  • On site and laboratory investigations
  • Defects manual
  • Report of present condition
  • Design of remedial works
  • Recommendation for maintenance
  • Bridge Information Management System BIMS
  • Training sessions

Bridge Information Management System BIMS

Bridge Information Management System BIMS is a dedicated software developed by Sering Int. for the Operation and  Maintenance of all 223 bridges in Muscat  Governorate. The system is a complete data base containing all technical information and current  structural conditions necessary to develop the  Operational and Maintenance Program.

Defects Manual

Sering Int. prepared a Defects Manual tailored on Client’s need starting from the following considerations:

  • Potential defects that could affect the bridges in Muscat Directorate
  • Data collection from wide international bibliography

Design of Remedial Works

Sering Int. developed the following activities

  • Ordinary maintenance works are required on 140 bridges out of a total of 223.
  • For 103 bridges, the design of the remedial works consists in typical design drawings and specific work design (for 45 bridges).
  • For 37 bridges, indications about routine inspection procedures have been specifically explained.

Activitiies training included:

  • Front-Office lessons
  • On site inspections
  • Software BIMS