Progetti

  • CLIENT

    BATCO/TEICO OVERSEAS LLC

  • LOCATION

    Sultanate of Oman

The project concerned road widening, visibility improvement and upgradation of safety requirements at various locations of Birakt Al  Mouz Sayq Road. The total length of the project is  approximately 30 km.

In order to check the existing conditions, 31 slopes have been identified 22 of which have been subject of Sering International assignment. They need a protection treatment to keep  the vehicular traffic safe from landslides.

Services provided by Sering International

  • Geological survey
  • Geo-mechanical survey along the entire area of the slopes
  • Critical elaboration of the experimental data from site investigations, to examine the physical-mechanical properties of rock
  • Geotechnical and geo-mechanical characterization of rock
  • Evaluation of the slope stability and study of failure mechanisms
  • Research, geotechnical terms, the best solutions for the rehabilitation of the slope
  • Detailed design of the slope stabilization works
  • Technical assistance to the Contractor during construction