Progetti

  • CLIENT

    Supreme Committee for Town Planning

  • LOCATION

    Duqm, Al-Wusta Governorate, Sultanate of Oman

The intervention for the hydraulic defence from the floods of the Royal Decree Boundary area and of the infrastructures located along the coast consists in the river training and channel design, realization of embanking works for the defense of the inhabited areas, creation of dam areas and the realization of flood diversion channels.

The objective of the study performed by Sering International is to carry out a comprehensive Drainage Master Plan of the Duqm Development. In particular the whole project includes the following main topics:

  • Analysis of flood risk in present conditions;
  • Definition of drainage network layout and design criteria;
  • Hydrological and hydrodynamics modelling analysis;
  • Sediment transport analysis;
  • Discreet hydraulic designs and terms of reference for the detailed design;
  • Provision of the complete operational model and related training.
  • Cost-benefits analysis.

This study provided the storm water planning that, in conjunction with the application of international standards, will allow the Authorities to address current and future storm water issues.