CLIENT
Ministry of Transport and Communications
LOCATION
Governorate of Al-Wusta – Sultanate of Oman
The project is located in Al Wusta Governorate and comprises two roads with total length of 33 km
- Al Sail Road is about 23 km long, starts from Shaib junction on Sinaw – Mahout existing road and ends an Qalat Al Elm school in Al Sail Village. The existing track generally passes through flat terrain and serves local traffic.
- Flim-Al Ghadan Road starts from Flim junction on the road link to Al Hijj roundabout and ends in Al Ghadan village on the coast. The new road passes through rolling terrain and serves local traffic; the length is about 8 km.
Critical issue:
- Interference with the natural discharge of the wadies
- Flim-Al Ghadan Road interfearing with the high tide and Sabkhah soils
Services provided by Sering International
- Concept Design
- Preliminary Design
- Detailed Design
- Tender Documents
- Construction Supervision
The Concept Design, the Preliminary Design and the Detailed Design have been approved by the Client.