Progetti

Qurum

  • CLIENT

    Federici Stirling Batco LLC

  • LOCATION

    Muscat Governorate – Sultanate of Oman

    The project concerns the rehabilitation/reconstruction of Qurum-Sarooj Road after Gonu Cyclone that hit Muscat City on June, 7th 2007. The road has a carriageway 22.2 m wide, comprising  2 traffic lanes, 2 parking lanes and 2 footpaths 4 m wide

    Works include the construction of two bridges. Bridge 1 is a 30 m long, single span bridge. Bridge 2 is a 150 m long, 5 spans bridge. Scouring protection of piers is assured by rock armour placed around the foundations. The superstructure of both bridges is made of no.18 precast, post tensioned, T shaped concrete girders and of a concrete slab 20 cm thick. Foundations consist of drilled and cast in place 800 mm diameter piles, 18 m long..

    Services provided by Sering International                                           

    • Road geometric design, Alignment variants, Study of drainage structures
    • Hydrology and Hydraulics study, Soils and materials investigations
    • Detailed Design
    • Construction Design and Drawings
    • Technical assistance to the Contractor during construction