Sering Ingegneria © Copyright  Tutti i diritti riservati Privacy Policy – Cookie Policy
Architecture, Buildings, and Urban Planning / Projects
Redevelopment of the Palermo Prosecutor’s Office Building (NRRP)

COUNTRY

Italy

LOCATION

Palermo
Go back

Abstract

The redevelopment project for the “Ex EAS” building in Palermo aims to restructure, seismically retrofit, and enhance the energy efficiency of a 1964 structure now designated for the Ministry of Justice as part of the PNRR. Structural interventions include improving seismic resistance by reinforcing columns and beams with fiber-reinforced concrete and carbon fibers, as well as creating a foundation coupling slab to distribute seismic stresses.

The building systems will be entirely renewed, with a focus on water and sanitation, fire prevention, and air conditioning systems. The water system will feature low-consumption devices, while the fire prevention system will include REI compartmentalizations, a hydrant network, and an aerosol extinguishing system. The air conditioning system will be enhanced with a geothermal heat pump and a mechanical ventilation system with heat recovery to ensure efficiency and thermal comfort.

On the energy front, a 136 kW photovoltaic system will cover part of the building’s energy needs, transforming it into a nearly zero-energy building (NZEB) compliant with DNSH requirements. This intervention emphasizes safety, sustainability, and energy savings, setting a benchmark for urban redevelopment projects.

Explore Projects